I-595 Express Improvements
MSE Crucifix, Top Wall and Temporary Barrier
Project Contractor: Dragados
Project Sub-Contractor: Bonn J
Project Description:
The I-595 Express Corridor Improvements Project , in Broward County, FL, consists of the reconstruction of the I-595 mainline and all associated improvements to frontage roads and ramps from the I-75/Sawgrass Expressway interchange to the I-595/I-95 interchange , for a total length along I-595 of approximately 10.5 miles, and approximately 2.5 miles on Florida’s Turnpike from Peters Road to Griffin Road. The design and construction cost of the project is approximately $1.2 billion.
A major component of the project is the construction of three at-grade reversible express toll lanes to be known as 595Express, serving express traffic to/from the I-75/Sawgrass Expressway from/to east of SR 7, with a direct connection to the median of Florida’s Turnpike. These lanes will be operated as managed lanes with variable tolls to optimize traffic flow, and will reverse directions in peak travel times (eastbound in the AM and westbound in the PM).
Evercast manufactured MSE Crucifix, Top Wall and Temporary Barrier products for this project.